Germany/Austria
| Lot A1 Cabling |
| Cabling |
| Customer: |
Arge ATB |
| Completion: |
06/2012 |
| Details: |
Total tunnel length: approx. 34,000 m |
|
1 tube (rail tunnel) |
|
|
|
Services:
Project management, site management, planning, development, documentation, monitoring
Supply and installation services for: energy and signalling cables
|
|
|
| Lot A2 Fibre-optic cable |
| Fibre-optic cable systems |
| Customer: |
Arge ATE |
| Completion: |
06/2012 |
| Details: |
Total tunnel length: approx. 34,000 m |
|
1 tube (rail tunnel) |
|
|
|
Services:
Project management, site management, planning, development, documentation, monitoring
Supply and installation services for: installation of fibre-optic cable systems
|
|
|
| A10 Tauern Tunnel: full redevelopment, new build |
| General electrical engineering |
| Customer: |
ASFINAG BMG |
| Completion: |
05/2011 |
| Details: |
Tunnel length: 6,800 m |
|
2 tubes |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV distribution lines, UPS system, tunnel and portal lighting, earthing and earth bonding, Structures, tube and supporting systems, measurement and control equipment, traffic guidance, emergency telephones, CCTV and audio equipment, hazard alert system, data wiring, building ventilation and air conditioning system, overall coordination
|
|
|
| Al Salam Street Tunnel, Abu Dhabi |
| SCADA system and video system |
| Customer: |
Sirti FZ LLC |
| Completion: |
04/2011 |
| Details: |
Tunnel length: 2,400 m |
|
2 tubes |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: CCTV, information processing overall coordination
|
|
|
| A12, Roppen Tunnel process control technology |
| Process control technology |
| Customer: |
ASFINAG BMG |
| Completion: |
03/2011 |
| Details: |
Tunnel length: 5,100 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage distribution cables, CCTV, emergency telephone, audio system, radio system, information transmission and processing, data wiring, building and tunnel refuge equipment, removal and reinstallation overall coordination
|
|
|
| A12, Roppen Tunnel |
| Process control technology |
| Customer: |
ASFINAG BMG |
| Completion: |
03/2011 |
| Details: |
Tunnel length: 5,100 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage distribution cables, CCTV, emergency telephone, audio system, radio system, information transmission and processing, data wiring, building and tunnel refuge equipment, removal and reinstallation overall coordination |
|
|
| STGS (Austrian Road Tunnel Safety Act) compliant retrofitting in ASFINAG high-priority road network |
| E&M equipment |
| Customer: |
ASFINAG BMG |
| Completion: |
07/2010 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage distribution cables, backup power supply, traffic guidance and monitoring, energy and data cabling, overall coordination
|
|
|
| A5, FOE PPP Eastern region |
| General electrical engineering |
| Customer: |
ARGE FOE PPP Eastern region |
| Completion: |
02/2010 |
| Details: |
4 tunnel systems, total tube length approx. 15,000 m, approx. 50 km in open air |
|
1 monitoring centre |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV system, UPS system, earthing and earth bonding, tunnel lighting, structures, tube and supporting systems, tunnel ventilation system, data wiring, building and refuge installation, traffic guidance, overall coordination
|
|
|
| A5, FOE PPP Eastern region |
| Control and telecontrol engineering |
| Customer: |
ARGE FOE PPP Eastern region |
| Completion: |
02/2010 |
| Details: |
4 tunnel systems, total tube length approx. 15,000 m, approx. 50 km open-air |
|
1 monitoring station |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Traffic guidance system, CCTV, emergency telephone, audio system, fire alarm system, measurement and control equipment, information transmission and processing, data wiring, overall coordination
|
|
|
| B10, Annweiler tunnel group |
|
|
Retrofitting of operating technology and tunnel ventilation
|
|
| Customer: |
| Landesbetrieb Mobilität Speyer |
|
| Completion: |
2010 (1.BA) |
| Details: |
Tunnel length: (1 tube each) |
|
|
- Kostenfels 305 m (section 1) - Staufer 1038 m (section 1) - Löwenherz 895 m (section 2) - Barbarossa 790 m (section 2)
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
| K 1402, Donzdorf Hochberg tunnelf |
|
|
|
| Customer: |
| Donzdorf Town Council, Building Department |
|
| Completion: |
2010
|
| Details: |
Tunnel length: 180 m |
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, data logging, fire alarm system in service building, traffic systems, emergency telephones, installation of control centre, control centre technology, tunnel radio system (optional)
|
|
|
| A62 National Motorway Hörnchenberg Tunnel |
|
| Retrofitting of tunnel engineering and safety equipment |
|
| Customer: |
|
Landesbetrieb Mobilität – Rheinland-Pfalz
|
|
| Completion: |
2010
|
| Details: |
Tunnel length: 510 m |
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, cross-passage lighting, data logging, fire alarm system, CCTV, intercom system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system
|
|
|
|
|
| Technical tunnel equipment |
|
| Customer: |
| Calw Rural District – Roadbuilding Department |
|
| Completion: |
2009 |
| Details: |
Tunnel length: 180 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system in service building, emergency telephones, traffic systems, installation of control centre, control centre technology
|
|
|
| B 300 Ebertring Tunnel, Memmingen |
|
| Retrofitting of operating technology |
|
| Customer: |
| Kempten State Building Authority – Roadbuilding Division |
|
| Completion: |
2009 |
| Details: |
Tunnel length: 190 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, fire alarm system in service building, measuring equipment, installation of control centres, control centre technology
|
|
|
| A9 Lainberg Tunnel |
| General electrical engineering and control technology |
| Customer: |
ASFINAG BMG |
| Completion: |
2009 |
| Details: |
Tunnel length: 2,500 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV system, UPS system, data wiring, measurement and control equipment, audio, traffic guidance, lightning protection, emergency telephones, information processing and transmission, building and tunnel ventilation system, sprinkler and wastewater systems, tunnel and road lighting, overall coordination
|
|
|
| A10 Katschberg/Tauern Tunnel |
| Process control technology |
| Customer: |
ASFINAG BMG |
| Completion: |
2009 |
| Details: |
Tunnel length: 5,800 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: CCTV, emergency telephones, information processing, automation control technology, overall coordination
|
|
|
| A10 full redevelopment, Katschberg Tunnel |
General electrical engineering
|
| Customer: |
ASFINAG BMG |
| Completion: |
2009 |
| Details: |
Tunnel length: 5,800 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV distribution lines, UPS system, tunnel and portal lighting, earthing and earth bonding, structures, tube and supporting systems, measurement and control equipment, traffic guidance, emergency telephones, CCTV and audio equipment, hazard alert system, data wiring, building ventilation and air conditioning, overall coordination
|
|
|
|
|
| Technical tunnel equipment |
|
| Customer: |
| Stuttgart Regional Council – Waiblingen Building Department |
|
| Completion: |
2009 |
| Details: |
Tunnel length: 1,080 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
| A2, A10, A11 Carinthia central control station |
| Systems engineering |
| Customer: |
ASFINAG BMG |
| Completion: |
5/2008 |
| Details: |
|
|
|
|
|
|
Services:
planning, development, documentation, commissioning
Supply and installation services for: Low voltage system, system adaptation (revisions to existing systems, USB system, earth and earth bonding) lightning protection, CCTV, audio, emergency telephones, telephone system, radio system, information transmission and processing, environmental data logging, data wiring, overall coordination
|
|
|
| S6 Ganzstein Tunnel |
Operating and safety equipment
|
| Customer: |
ASFINAG BMG |
| Completion: |
2008 |
| Details: |
Tunnel length: 2,100 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV system, UPS system, data wiring, measurement and control equipment, audio, traffic guidance, lightning protection, emergency telephones, information processing and transmission, building and tunnel ventilation system, sprinkler and wastewater equipment, tunnel and road lighting, overall coordination
|
|
|
|
|
| Retrofitting of technical equipment |
|
| Customer: |
| Karlsruhe Regional Council - Heidelberg office |
|
| Completion: |
2008 |
| Details: |
Tunnel length: 2,715 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
|
|
| Retrofitting of tunnel engineering and safety equipment |
|
| Customer: |
| Karlsruhe Regional Council – Bühl Building Management |
|
| Completion: |
2008 |
| Details: |
Tunnel length: 1,020 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
|
|
|
|
| Customer: |
| Tübingen Regional Council – Ehingen office |
|
| Completion: |
2008 |
| Details: |
Tunnel length: 400 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system, CCTV, data logging, traffic systems, installation of control centre, control centre technology, tunnel radio system
|
|
|
| BAB A 71 Behringen Tunnel |
|
| Retrofitting of safety equipment |
|
| Customer: |
| Free State of Thuringia, State Office of Roadbuilding |
|
| Completion: |
2008 |
| Details: |
Tunnel length: 465 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, complete energy and control cabling, switching systems, lighting, data logging, CCTV, intercom system, fire alarm system, traffic systems, installation of control centres, tunnel radio system, control centre technology
|
|
|
| BAB A 111 – Tegel Airport Tunnel |
|
| Technical tunnel equipment: tunnel ventilation |
|
| Customer: |
| Berlin Senate Administration for Urban Development |
|
| Completion: |
2008 |
| Details: |
Tunnel length: 967 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Tunnel ventilation, energy and control cabling, ventilation control system, switching systems
|
|
|
| B140 Steyrtal Road, Grünburg Tunnel |
| Electrical engineering equipment, connection to Wels traffic monitoring centre |
| Customer: |
ASFINAG SGN |
| Completion: |
2008 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning overall coordination
|
|
|
| B145, Traunsee Tunnels |
| Electrical engineering equipment, connection to ÜZ Wels |
| Customer: |
ASFINAG SGN |
| Completion: |
|
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning overall coordination
|
|
|
| A6 NE motorway, A4 Kittsee junction |
| E&M equipment |
| Customer: |
ASFINAG BMG |
| Completion: |
2008 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data wiring, measurement and control equipment, video, traffic sign control system, automation control technology, emergency telephones, overall coordination
|
|
|
| B140 Steyrtal Road, Grünburg Tunnel |
| Electrical engineering equipment, connection to Wels traffic monitoring centre |
| Customer: |
ASFINAG SGN |
| Completion: |
2008 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning overall coordination
|
|
|
| A6 NE motorway, A4 Kittsee junction |
| E&M equipment |
| Customer: |
ASFINAG BMG |
| Completion: |
2008 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data wiring, measurement and control equipment, video, traffic sign control system, automation control technology, emergency telephones, overall coordination
|
|
|
|
|
| Retrofitting of operating facilities and tunnel ventilation |
|
| Customer: |
| Karlsruhe Regional Council |
|
| Completion: |
2007 |
| Details: |
Tunnel length: 1,950 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, escape passage lighting, CCTV, intercom system, fire alarm system, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
|
|
|
|
| Customer: |
| Berlin Senate Administration for Urban Development |
|
| Completion: |
2007 |
| Details: |
Tunnel length: 900 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: CO2 data logging, flow monitoring, tunnel ventilation, switching systems and distributors, energy and control cabling
|
|
|
| B277 Schlossberg Tunnel, Dillenburg |
|
| Technical tunnel equipment |
|
| Customer: |
| Koblenz Road and Traffic Department |
|
| Completion: |
2007 |
| Details: |
Tunnel length: 780 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Medium voltage system, low voltage main distribution system, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
|
|
|
| A9, Inz.-Schön, traffic diversion, AE and LT |
| B138 roundabout information board |
| Customer: |
ASFINAG BMG |
| Completion: |
2007 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Traffic signal systems, traffic signs, AE cabling and control technology
|
|
|
|
|
| Retrofitting of operating facilities |
|
| Customer: |
| Southern Bavaria Motorway Directorate, Kempten office |
|
| Completion: |
2007 |
| Details: |
Tunnel length: 177 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, emergency telephones, control centre technology, tunnel radio system
|
|
|
| B167, L101 Klammstein and Wartstein Tunnel |
| Renovation of lighting |
| Customer: |
Province of Salzburg |
| Completion: |
2007 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: LV distribution system, cabling, tunnel lighting overall coordination
|
|
|
| A10 Trebesing noise barrier |
| Electromechanical equipment |
| Customer: |
PKE Electronics AG |
| Completion: |
8/2007 |
| Details: |
Tunnel length: 1,700 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data cabling, measurement and control equipment, it UPS system, emergency telephones, tunnel lighting, traffic signs, automation control technology
|
|
|
| A7 Bindermichl - Niedernhart section |
| Incorporation of TCS in Wels tunnel control centre, connection of TCS to tunnel control technology, extension of tunnel control centre at Wels traffic control centre |
| Customer: |
Province of Upper Austria/ASFINAG |
| Completion: |
6/2007 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning overall coordination
|
|
|
| DIVVA |
| Dynamically controlled system for increasing traffic flow quality and traffic safety when closing lanes on motorways |
| Customer: |
ASFINAG Verkehrstelematik |
| Completion: |
4/2007 |
| Details: |
Länge: 1,300 m
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data cabling, measurement and control equipment, traffic logging, traffic signs, automation control technology, LED TCS, prisma TCS, LED information board, route station, KRI, U Z overall coordination
|
|
|
| S16 Strenger Tunnel |
| Electrical engineering |
| Customer: |
Alpenstraßen AG |
| Completion: |
9/2006 |
| Details: |
Tunnel length: 5,800 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Medium and low voltage system, UPS system, earth and lightning protection, installations and lighting, ventilation monitoring, traffic monitoring and control, tunnel CCTV, emergency telephone and audio system, tunnel radio system, fire alarm system, stored program control system, control centre technology, cabling, overall coordination
|
|
|
| A7 Bindermichl - Niedernhart section |
| Lowering and enclosing of E&M technology |
| Customer: |
Province of Upper Austria |
| Completion: |
8/2006 |
| Details: |
Tunnel length: 3,200 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
|
|
|
| A10 renovation of Ofenauer-Hiefler Tunnel |
| E&M technology |
| Customer: |
ARGE Sanierung Ofenauer-Hieflertunnel |
| Completion: |
5/2006 |
| Details: |
Tunnel length: 3,350 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
|
|
|
| L379 UFT Feldkirchnerstrasse - Airport |
| Electrical and safety technology |
| Customer: |
Province of Styria |
| Completion: |
4/2006 |
| Details: |
Tunnel length: 500 m |
|
Tubes: 1 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data cabling, measurement and control equipment, traffic logging, traffic signal systems, traffic signs, automation control technology, overall coordination
|
|
|
| S16 Arlbergschnellstr. – Strenger Tunnel |
| Extension of OCS in TW Imst and incorporation in St. Jakob TCC |
| Customer: |
ASFINAG Alpenstraßen GmbH |
| Completion: |
3/2006 |
| Details: |
|
|
|
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Operations control centre, data wiring, CCTV, furnishings, additional systems, data link, overall coordination
|
|
|
| B62/L280 St. Barbara Tunnel, Betzdorf |
|
| Technical tunnel equipment |
|
| Customer: |
| Koblenz Road and Traffic Department |
|
| Completion: |
2006 |
| Details: |
Tunnel length: 380 m
|
|
|
|
|
|
Services:
Project management, planning, development, documentation, commissioning
Supply and installation services for: Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system, CCTV, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system
|
|
|
| A9 Inzersdorf - Schön |
| General electrical engineering and control technology |
| Customer: |
ÖSAG |
| Completion: |
1/2005 |
| Details: |
Tunnel length: 4,000 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
|
|
|
| A9 Plabutsch Tunnel |
| New build and renovation of electrical, security and control equipment |
| Customer: |
Province of Styria |
| Completion: |
1/2005 |
| Details: |
Tunnel length: 10,000 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Medium voltage system, data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
|
|
|
| A9 Schartnerkogel Tunnel |
| Improvements to tunnel safety and refuge structure |
| Customer: |
ÖSAG |
| Completion: |
12/2003 |
| Details: |
Tunnel length: 1,300 m |
|
Tubes: 2 |
|
|
|
Services:
Project management, site management, planning, development, documentation, commissioning
Supply and installation services for: Tunnel refuge structure
|
|
|
|