Projects PDF  |  Print

Germany/Austria

Lot A1 Cabling
Cabling
Customer: Arge ATB
Completion: 06/2012
Details: Total tunnel length: approx. 34,000 m
1 tube (rail tunnel)

Services:


Project management, site management, planning, development, documentation, monitoring

Supply and installation services for:
energy and signalling cables
Lot A2 Fibre-optic cable
Fibre-optic cable systems
Customer: Arge ATE
Completion: 06/2012
Details: Total tunnel length: approx. 34,000 m
1 tube (rail tunnel)

Services:


Project management, site management, planning, development, documentation, monitoring

Supply and installation services for:
installation of fibre-optic cable systems
A10 Tauern Tunnel: full redevelopment, new build
General electrical engineering
Customer: ASFINAG BMG
Completion: 05/2011
Details: Tunnel length: 6,800 m
2 tubes

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
LV distribution lines, UPS system, tunnel and portal lighting, earthing and earth bonding,
Structures, tube and supporting systems, measurement and control equipment, traffic guidance, emergency telephones, CCTV and audio equipment, hazard alert system, data wiring, building ventilation and air conditioning system, overall coordination
Al Salam Street Tunnel, Abu Dhabi
SCADA system and video system
Customer: Sirti FZ LLC
Completion: 04/2011
Details: Tunnel length: 2,400 m
2 tubes

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
CCTV, information processing overall coordination
A12, Roppen Tunnel process control technology
Process control technology
Customer: ASFINAG BMG
Completion: 03/2011
Details: Tunnel length: 5,100 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage distribution cables, CCTV, emergency telephone, audio system, radio system, information transmission and processing, data wiring, building and tunnel refuge equipment, removal and reinstallation
overall coordination
A12, Roppen Tunnel
Process control technology
Customer: ASFINAG BMG
Completion: 03/2011
Details: Tunnel length: 5,100 m
Tubes: 2

Services:


Project management, site management,
planning, development, documentation, commissioning

Supply and installation services for:
Low voltage distribution cables, CCTV, emergency telephone, audio system, radio system, information transmission and processing, data wiring, building and tunnel refuge equipment, removal and reinstallation overall coordination
STGS (Austrian Road Tunnel Safety Act) compliant retrofitting in ASFINAG high-priority road network
E&M equipment
Customer: ASFINAG BMG
Completion: 07/2010
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage distribution cables, backup power supply, traffic guidance and monitoring, energy and data cabling, overall coordination
A5, FOE PPP Eastern region
General electrical engineering
Customer: ARGE FOE PPP Eastern region
Completion: 02/2010
Details: 4 tunnel systems, total tube length approx. 15,000 m, approx. 50 km in open air
1 monitoring centre

A5 FOE PPP East region

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
LV system, UPS system, earthing and earth bonding, tunnel lighting, structures, tube and supporting systems, tunnel ventilation system, data wiring, building and refuge installation, traffic guidance,
overall coordination
A5, FOE PPP Eastern region
Control and telecontrol engineering
Customer: ARGE FOE PPP Eastern region
Completion: 02/2010
Details: 4 tunnel systems, total tube length approx. 15,000 m, approx. 50 km open-air
1 monitoring station

A5 FOE PPP East region

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Traffic guidance system, CCTV, emergency telephone, audio system, fire alarm system, measurement and control equipment, information transmission and processing, data wiring, overall coordination
B10, Annweiler tunnel group

Retrofitting of operating technology and tunnel ventilation

Customer:
Landesbetrieb Mobilität Speyer
Completion: 2010 (1.BA)
Details: Tunnel length: (1 tube each)

- Kostenfels 305 m (section 1)
- Staufer 1038 m (section 1)
- Löwenherz 895 m (section 2)
- Barbarossa 790 m (section 2)


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
K 1402, Donzdorf Hochberg tunnelf
Tunnel ventilation
Customer:
Donzdorf Town Council, Building Department
Completion: 2010
Details: Tunnel length: 180 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, data logging, fire alarm system in service building, traffic systems, emergency telephones, installation of control centre, control centre technology, tunnel radio system (optional)
A62 National Motorway Hörnchenberg Tunnel
Retrofitting of tunnel engineering and safety equipment
Customer:

Landesbetrieb Mobilität – Rheinland-Pfalz

Completion: 2010
Details: Tunnel length: 510 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, cross-passage lighting, data logging, fire alarm system, CCTV, intercom system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system
K 4339, Rohrdorf Tunnel
Technical tunnel equipment
Customer:
Calw Rural District – Roadbuilding Department
Completion: 2009
Details: Tunnel length: 180 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system in service building, emergency telephones, traffic systems, installation of control centre, control centre technology
B 300 Ebertring Tunnel, Memmingen
Retrofitting of operating technology
Customer:
Kempten State Building Authority – Roadbuilding Division
Completion: 2009
Details: Tunnel length: 190 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:

Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, fire alarm system in service building, measuring equipment, installation of control centres, control centre technology

A9 Lainberg Tunnel
General electrical engineering and control technology
Customer: ASFINAG BMG
Completion: 2009
Details: Tunnel length: 2,500 m
Tubes: 2

A9 Lainberg tunnel

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
LV system, UPS system, data wiring, measurement and control equipment, audio,
traffic guidance, lightning protection, emergency telephones, information processing and transmission,
building and tunnel ventilation system, sprinkler and wastewater systems, tunnel and road lighting, overall coordination
A10 Katschberg/Tauern Tunnel
Process control technology
Customer: ASFINAG BMG
Completion: 2009
Details: Tunnel length: 5,800 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
CCTV, emergency telephones, information processing, automation control technology, overall coordination
A10 full redevelopment, Katschberg Tunnel
General electrical engineering
Customer: ASFINAG BMG
Completion: 2009
Details: Tunnel length: 5,800 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
LV distribution lines, UPS system, tunnel and portal lighting, earthing and earth bonding,
structures, tube and supporting systems, measurement and control equipment, traffic guidance, emergency telephones,
CCTV and audio equipment, hazard alert system, data wiring, building ventilation and air conditioning, overall coordination
B14 Leutenbach tunnel
Technical tunnel equipment
Customer:
Stuttgart Regional Council – Waiblingen Building Department
Completion: 2009
Details: Tunnel length: 1,080 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and
installation services for:
Medium voltage system, low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, installation of control centres, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
A2, A10, A11 Carinthia central control station
Systems engineering
Customer: ASFINAG BMG
Completion: 5/2008
Details:

A2, A10, A11 Carinthia central control station

Services:


planning, development, documentation, commissioning

Supply and installation services for:
Low voltage system, system adaptation (revisions to existing systems, USB system, earth and earth bonding) lightning protection, CCTV, audio, emergency telephones, telephone system, radio system, information transmission and processing, environmental data logging, data wiring, overall coordination
S6 Ganzstein Tunnel
Operating and safety equipment
Customer: ASFINAG BMG
Completion: 2008
Details: Tunnel length: 2,100 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and
installation services for:
LV system, UPS system, data wiring, measurement and control equipment, audio, traffic guidance, lightning protection, emergency telephones, information processing and transmission, building and tunnel ventilation system, sprinkler and wastewater equipment, tunnel and road lighting, overall coordination
B38 Saukopf Tunnel
Retrofitting of technical equipment
Customer:
Karlsruhe Regional Council - Heidelberg office
Completion: 2008
Details: Tunnel length: 2,715 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
L 77a, Rastatt Tunnel
Retrofitting of tunnel engineering and safety equipment
Customer:
Karlsruhe Regional Council – Bühl Building Management
Completion: 2008
Details: Tunnel length: 1,020 m
Tube: 1

Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, CCTV, intercom system, fire alarm system, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation

B10, Lehrer-Tal Tunne

l
Operating facilities
Customer:
Tübingen Regional Council – Ehingen office
Completion: 2008
Details: Tunnel length: 400 m

Tubes: 2


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system, CCTV, data logging, traffic systems, installation of control centre, control centre technology, tunnel radio system
BAB A 71 Behringen Tunnel
Retrofitting of safety equipment
Customer:
Free State of Thuringia, State Office of Roadbuilding
Completion: 2008
Details: Tunnel length: 465 m

Tubes: 2


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, complete energy and control cabling, switching systems, lighting, data logging, CCTV, intercom system, fire alarm system, traffic systems, installation of control centres, tunnel radio system, control centre technology
BAB A 111 – Tegel Airport Tunnel
Technical tunnel equipment: tunnel ventilation
Customer:
Berlin Senate Administration for Urban Development
Completion: 2008
Details: Tunnel length: 967 m

Tubes: 2


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Tunnel ventilation, energy and control cabling, ventilation control system, switching systems
B140 Steyrtal Road, Grünburg Tunnel
Electrical engineering equipment, connection to Wels traffic monitoring centre
Customer: ASFINAG SGN
Completion: 2008
Details:

Services:


Project management, site management, planning, development, documentation, commissioning
overall coordination
B145, Traunsee Tunnels
Electrical engineering equipment, connection to ÜZ Wels
Customer: ASFINAG SGN
Completion:
Details:

Services:


Project management, site management, planning, development, documentation, commissioning
overall coordination
A6 NE motorway, A4 Kittsee junction
E&M equipment
Customer: ASFINAG BMG
Completion: 2008
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data wiring, measurement and control equipment, video, traffic sign control system, automation control technology, emergency telephones, overall coordination
B140 Steyrtal Road, Grünburg Tunnel
Electrical engineering equipment, connection to Wels traffic monitoring centre
Customer: ASFINAG SGN
Completion: 2008
Details:

Services:


Project management, site management, planning, development, documentation, commissioning
overall coordination
A6 NE motorway, A4 Kittsee junction
E&M equipment
Customer: ASFINAG BMG
Completion: 2008
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data wiring, measurement and control equipment, video, traffic sign control system, automation control technology, emergency telephones, overall coordination
L 562 Wattkopf Tunnel
Retrofitting of operating facilities and tunnel ventilation
Customer:
Karlsruhe Regional Council
Completion: 2007
Details: Tunnel length: 1,950 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, escape passage lighting, CCTV, intercom system, fire alarm system, traffic systems, control centre technology, tunnel radio system, data logging, tunnel ventilation
BAB A113 Rudower Höhe
Tunnel ventilation
Customer:
Berlin Senate Administration for Urban Development
Completion: 2007
Details: Tunnel length: 900 m

Tubes: 2


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
CO2 data logging, flow monitoring, tunnel ventilation, switching systems and distributors, energy and control cabling
B277 Schlossberg Tunnel, Dillenburg
Technical tunnel equipment
Customer:
Koblenz Road and Traffic Department
Completion: 2007
Details: Tunnel length: 780 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Medium voltage system, low voltage main distribution system, UPS system, complete energy and control cabling, switching systems, lighting, CCTV, intercom system, fire alarm system, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system, data logging, tunnel ventilation
A9, Inz.-Schön, traffic diversion, AE and LT
B138 roundabout information board
Customer: ASFINAG BMG
Completion: 2007
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Traffic signal systems, traffic signs, AE cabling and control technology
AK Memmingen Tunnel, A7
Retrofitting of operating facilities
Customer:
Southern Bavaria Motorway Directorate, Kempten office
Completion: 2007
Details: Tunnel length: 177 m
Tube: 1

Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, emergency telephones, control centre technology, tunnel radio system
B167, L101 Klammstein and Wartstein Tunnel
Renovation of lighting
Customer: Province of Salzburg
Completion: 2007
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
LV distribution system, cabling, tunnel lighting
overall coordination
A10 Trebesing noise barrier
Electromechanical equipment
Customer: PKE Electronics AG
Completion: 8/2007
Details: Tunnel length: 1,700 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data cabling, measurement and control equipment, it UPS system, emergency telephones, tunnel lighting, traffic signs, automation control technology
A7 Bindermichl - Niedernhart section
Incorporation of TCS in Wels tunnel control centre, connection of TCS to tunnel control technology, extension of tunnel control centre at Wels traffic control centre
Customer: Province of Upper Austria/ASFINAG
Completion: 6/2007
Details:

A7 Abschnitt Bindermichl – Niedernhart section

Services:


Project management, site management, planning, development, documentation, commissioning
overall coordination
DIVVA
Dynamically controlled system for increasing traffic flow quality and traffic safety when closing lanes on motorways
Customer: ASFINAG Verkehrstelematik
Completion: 4/2007
Details: Länge: 1,300 m

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data cabling, measurement and control equipment, traffic logging, traffic signs, automation control technology,
LED TCS, prisma TCS, LED information board, route station, KRI, U Z
overall coordination
S16 Strenger Tunnel
Electrical engineering
Customer: Alpenstraßen AG
Completion: 9/2006
Details: Tunnel length: 5,800 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Medium and low voltage system, UPS system, earth and lightning protection, installations and lighting, ventilation monitoring, traffic monitoring and control, tunnel CCTV, emergency telephone and audio system, tunnel radio system, fire alarm system, stored program control system, control centre technology, cabling, overall coordination
A7 Bindermichl - Niedernhart section
Lowering and enclosing of E&M technology
Customer: Province of Upper Austria
Completion: 8/2006
Details: Tunnel length: 3,200 m
Tubes: 2

A7 Abschnitt Bindermichl – Niedernhart section

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
A10 renovation of Ofenauer-Hiefler Tunnel
E&M technology
Customer: ARGE Sanierung Ofenauer-Hieflertunnel
Completion: 5/2006
Details: Tunnel length: 3,350 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
L379 UFT Feldkirchnerstrasse - Airport
Electrical and safety technology
Customer: Province of Styria
Completion: 4/2006
Details: Tunnel length: 500 m
Tubes: 1

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and
installation services for:
Data cabling, measurement and control equipment,  traffic logging, traffic signal systems, traffic signs, automation control technology, overall coordination
S16 Arlbergschnellstr. – Strenger Tunnel
Extension of OCS in TW Imst and incorporation in St. Jakob TCC
Customer: ASFINAG Alpenstraßen GmbH
Completion: 3/2006
Details:

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Operations control centre, data wiring, CCTV, furnishings, additional systems, data link, overall coordination
B62/L280 St. Barbara Tunnel, Betzdorf
Technical tunnel equipment
Customer:
Koblenz Road and Traffic Department
Completion: 2006
Details: Tunnel length: 380 m

Tube: 1


Services:


Project management, planning, development, documentation, commissioning

Supply and installation services for:
Low voltage main distribution cables, UPS system, complete energy and control cabling, switching systems, lighting, fire alarm system, CCTV, emergency telephones, traffic systems, installation of control centre, control centre technology, tunnel radio system
A9 Inzersdorf - Schön
General electrical engineering and control technology
Customer: ÖSAG
Completion: 1/2005
Details: Tunnel length: 4,000 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Data wiring, measurement and control equipment, CCTV and audio, fire alarm systems, traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
A9 Plabutsch Tunnel
New build and renovation of electrical, security and control equipment
Customer: Province of Styria
Completion: 1/2005
Details: Tunnel length: 10,000 m
Tubes: 2

A9 Plabutsch tunnel

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Medium voltage system, data wiring, measurement and control equipment, CCTV and audio, fire alarm systems,
traffic logging, traffic signal systems, traffic signs, automation control technology, emergency telephones, process visualisation, control centre equipment, overall coordination
A9 Schartnerkogel Tunnel
Improvements to tunnel safety and refuge structure
Customer: ÖSAG
Completion: 12/2003
Details: Tunnel length: 1,300 m
Tubes: 2

Services:


Project management, site management, planning, development, documentation, commissioning

Supply and installation services for:
Tunnel refuge structure
 